Alberta Forestry and Parks · Awarded contract
Awarded

Engineering and Construction Administration Consultant Services for Cardinal Headwaters Trail Phase II Development

Awarded 01 Sep 2026

View live tenders
Awarded01 Sep 2026
Value$328,877.00
ProvinceAlberta
CategoryConstruction
Expires in 1y 10mo2y 1mo term, 10% elapsed
Awarded 1 Sept 2026Expires 28 Sept 2028

Alberta Forestry and Parks awarded a contract to 1963401 Alberta Ltd.

for engineering and construction administration consultant services for the Coal Branch PLUZ Cardinal Headwaters Trail Phase II Development.

The work includes construction of a single span bridge crossing at Site 1 for 4x4 vehicle use, decommissioning of existing informal river crossing and access routes, information kiosk replacement, vault toilet installation, installation of fire rings and formalizing existing rustic camp sites, and signage upgrades using Alberta Parks standard sign catalogue.

The contract value is $328,877, with services scheduled from September 1, 2026 to September 28, 2028.

Similar open tenders12

Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Canmore Area Trails Master Plan Phase 1 — Trail Design and Construction Administration (Highline, Montane, CNC, BVRA East)Infrastructure
09 Dec 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Construction Administration for Highway No. 8 Bridge Replacements over Bighorn Brook and Spruce Creek – Saskatchewan Ministry of HighwaysInfrastructure
30 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Construction Administration & Site Inspection for Highway No. 3 Bridge Replacement over Sturgeon River (west of Prince Albert)Infrastructure
23 Nov 2026
Engineering Consultant Services for Asphalt Concrete Pavement on Highways 43 and 49 in AlbertaInfrastructure
24 Nov 2026
Grade Widening & Intersection Improvements – Stoney Trail at 52 Street SE (Eastbound Exit Lane & Dual Northbound-to-Westbound Right Turn)Infrastructure
14 Dec 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.