Tender: Development of PSSE Breaker-Node and Dynamic Load Models – Implementation Program of Work
Released 5 days ago
About
Supplier needed to deliver the TPL-001-5.1 Implementation Program of Work to develop a PSSE Breaker Node Model and associated framework, and to create Dynamic Load Models along with corresponding frameworks. The work focuses on building modelled breaker-node representations for PSSE analysis and producing dynamic load modelling solutions and supporting frameworks for integration into study and simulation workflows.
Tender breakdown
From 6 documentsAESO will confirm final scope after initial tasks; anticipated bus counts are estimates (final scope may be smaller/larger and AESO may do portions internally)
Failure to meet any mandatory requirements in Part B results in disqualification with no liability to AESO
AESO may split scopes among multiple suppliers or award none; RFP creates no obligation to contract
Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.
Documents6
Grouped by what each file is for
Similar open tenders1
Similar awarded contracts5
Likely value $180K to $330KAgency spend history
Alberta Electric System OperatorContract size
What Alberta Electric System Operator has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.