Bridge Maintenance and Repair Program for City of Medicine Hat
City of Medicine Hat · Awarded contract
AwardedBridge Maintenance and Repair Program for City of Medicine Hat
Awarded 15 May 2026
Awarded15 May 2026
Value$757,000.00
SupplierMJB Enterprises Ltd
AgencyCity of Medicine Hat
ProvinceAlberta
CategoryInfrastructure
Ended 2mo ago5mo term
Awarded 15 May 2026Expired 30 Sept 2026
About
The City of Medicine Hat awarded a contract to MJB Enterprises Ltd for bridge repairs across seven structures, including pedestrian overpasses, underpasses, and vehicle bridges, as part of the 2026 Bridge Maintenance Program.
The contract value is CAD 757,000.
Similar open tenders12
TenderCloses
MHS-11 Transmission and Distribution Line Construction Services – City of Medicine HatInfrastructure
26 Nov 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026
Bridge Rehabilitation – Highway 49 over Spirit River at West Boundary of Rycroft (km 34.437)Infrastructure
17 Dec 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Bridge Rehabilitation – Highway 36 over Red Deer River near Duchess, ABInfrastructure
26 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Citywide Horizontal Directional Drilling Services — City of Medicine Hat (As-Needed Contract)Infrastructure
01 Dec 2026
Reconstruction of Two Overpass Bridges on Autoroute 40 (Québec) — Complex Bridge/Tunnel Works ContractInfrastructure
27 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





