Conceptual Design for Medicine Hill Pedestrian, Cycling and Multi-Use Bridge by DIALOG
City of Calgary · Awarded contract
AwardedConceptual Design for Medicine Hill Pedestrian, Cycling and Multi-Use Bridge by DIALOG
Awarded 01 Jul 2024
Ended 1y 12mo ago5mo term
Awarded 1 July 2024Expired 30 Nov 2024
About
The City of Calgary awarded a contract to DIALOG Alberta Architecture Engineering Interior Design Planning Inc.
for conceptual design of the new Medicine Hill Pedestrian, Cycling and Multi-Use Bridge.
The contract, valued at CAD 1,337,669.55, was awarded through a procurement process open only to pre-qualified engineering firms under the New Bridges discipline.
Similar open tenders12
TenderCloses
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Preliminary Master Planning & Site Concept Design for Vic Park Bus Facility Lands – CalgaryInfrastructure
26 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Transportation Planning and Design Pre-Qualification – City of EdmontonInfrastructure
29 Feb 2028
MHS-11 Transmission and Distribution Line Construction Services – City of Medicine HatInfrastructure
26 Nov 2026
Prequalification of Engineering Consultants for Transportation Infrastructure – Municipal District of Smoky River No. 130 (2026–2029)Infrastructure
26 Nov 2026
Design and Implementation of Replacement Marine Berth Infrastructure – Digby (NS) & Saint John (NB) Ferry TerminalsInfrastructure
15 Dec 2026
Grade Widening & Intersection Improvements – Stoney Trail at 52 Street SE (Eastbound Exit Lane & Dual Northbound-to-Westbound Right Turn)Infrastructure
14 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





