Construction of Headslope Fills for Terwillegar Drive Stage 3 Pregrading
City of Edmonton · Awarded contract
AwardedConstruction of Headslope Fills for Terwillegar Drive Stage 3 Pregrading
Awarded 10 Oct 2024
Awarded10 Oct 2024
Value$5,927,997.97
SupplierPrairie North Const. Ltd.
AgencyCity of Edmonton
ProvinceAlberta
CategoryInfrastructure
Ended 1y 5mo ago9mo term
Awarded 10 Oct 2024Expired 30 June 2025
About
The City of Edmonton awarded a contract to Prairie North Const.
Ltd.
for the construction of headslope fills at the Terwillegar Drive Interchange at the junction of Anthony Henday Drive Southwest, including the supply of all labour, materials, equipment, and services.
The contract value is CAD 5,927,997.97.
Similar open tenders12
TenderCloses
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Design and Tender Package for Grading and Surfacing of Highway No. 106 (Tyrrell Lake Access Rd to Hwy 167) — Saskatchewan Ministry of HighwaysInfrastructure
26 Nov 2026
Grade Widening & Intersection Improvements – Stoney Trail at 52 Street SE (Eastbound Exit Lane & Dual Northbound-to-Westbound Right Turn)Infrastructure
14 Dec 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Full Depth Reclamation and Asphalt Pavement – Hwy 24 to 12 km S of Hwy 901 (km 0.000–16.700)Infrastructure
03 Dec 2026
Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026
Construction Administration & Site Inspection for Highway No. 3 Bridge Replacement over Sturgeon River (west of Prince Albert)Infrastructure
23 Nov 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Construction Administration for Grading and Gravel Surfacing — Highway 915-01 (35.44 km from Highway 102)Infrastructure
15 Dec 2026
Canal Liner Replacement – Lethbridge Northern Headworks Main Canal (Sta. 60+000–63+675)Water & Sanitation
26 Nov 2026
Saskatchewan Ministry of Highways – Design and Tender Packages for Safety Improvement ProjectsInfrastructure
27 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





