Alberta Transportation and Economic Corridors awarded a contract to SVEMY Construction Ltd.
for the construction of a precast prestressed concrete girder bridge and other work on Highway 777:01 over the Sturgeon River, 3 km NE of Onoway, Alberta, at kilometre 1.175.
The scope includes traffic accommodation, demolition and disposal of the existing bridge structure, supply of piling (163 metres of plain steel H-pile HP 310 x 94), pile set-up (36 piles), abutment construction, supply and fabrication, delivery and erection of precast concrete units, roadway work, and supply and installation of guardrail.
The contractor is to supply all materials.
The contract value is CAD 2,100,000, with a completion date of October 15, 2026.