Réseau de Transport Métropolitain (EXO) awarded a contract to FNX-INNOV INC.
for the preparation of the preliminary design, plans and specifications, support services during the tendering and construction phases, and supervision for the implementation of a crosswalk and bus stops on Route 209.
The contract value is CAD 305,457.99.
Similar open tenders12
TenderCloses
Upgrade of Pedestrian Crossings and FRCR Installation on Route 229 opposite INRS, VarennesInfrastructure
25 Nov 2026
School Crossing Installation and Pavement Rehabilitation on Route 393 - Abitibi-TémiscamingueInfrastructure
07 Dec 2026
Reconfiguration of Intersections at Routes 25, 125, 158 and Rue Saint-Isidore — Saint-EspritInfrastructure
09 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Reconstruction of Route 604 Bridge (Gourganne Sector) – Réserve faunique des LaurentidesInfrastructure
09 Dec 2026
Environmental, Regulatory, Engineering and Design Support for Mackenzie Valley Highway Project – GNWT Department of InfrastructureInfrastructure
08 Dec 2026
Grade Widening & Intersection Improvements – Stoney Trail at 52 Street SE (Eastbound Exit Lane & Dual Northbound-to-Westbound Right Turn)Infrastructure
14 Dec 2026
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open consultancy and legal tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far