Engineering Consultant Services for Roadway Preliminary Engineering in Peace Region
Alberta Transportation and Economic Corridors · Awarded contract
AwardedEngineering Consultant Services for Roadway Preliminary Engineering in Peace Region
Awarded 09 Dec 2024
Ended 1y 11mo ago1d term
Awarded 9 Dec 2024Expired 10 Dec 2024
About
Alberta Transportation and Economic Corridors awarded a contract to WSP Canada Inc.
for engineering consultant services for roadway preliminary engineering regional assignments, specifically for surfacing strategies and seal coat assessments in the Peace Region.
The contract value is CAD 2,457,610.
Similar open tenders12
TenderCloses
Engineering Consultant Services for CMR Program Projects – North Central Region (Assignments 1–3) – Alberta Transportation and Economic CorridorsInfrastructure
07 Dec 2026
Engineering Consultant Services for Asphalt Concrete Pavement on Highways 43 and 49 in AlbertaInfrastructure
24 Nov 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Chip Seal, Crack Repair and Pavement Marking – Peace Region 2027 Seal Coat ProgramInfrastructure
02 Dec 2026
Saskatchewan Ministry of Highways – Design and Tender Packages for Safety Improvement ProjectsInfrastructure
27 Nov 2026
Transportation Planning and Design Pre-Qualification – City of EdmontonInfrastructure
29 Feb 2028
City of Wetaskiwin – Engineering Consulting Services for Water, Roads and Utilities (3‑Year Standing Offer with 2‑Year Option, 2027–2029)Infrastructure
10 Dec 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Grade Widening & Intersection Improvements – Stoney Trail at 52 Street SE (Eastbound Exit Lane & Dual Northbound-to-Westbound Right Turn)Infrastructure
14 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





