Alberta Forestry and Parks · Awarded contract
Awarded

Rail Trail Maintenance from Nordegg Industrial Area to Jackfish Creek

Awarded 01 May 2025

View live tenders
Awarded01 May 2025
Value$110,000.00
ProvinceAlberta
CategoryInfrastructure
Ended 11mo ago8mo term
Awarded 1 May 2025Expired 31 Dec 2025

Alberta Forestry and Parks awarded a contract to Ahlstrom Construction Ltd.

for general trail maintenance of the approximately 50km Rail Trail from the Nordegg Industrial Area to the west side of Jackfish Creek, including 138 culverts and 9 bridges.

The work involved using hand tools, power saws, and small to larger equipment to maintain the trail and associated infrastructure, with reclamation work as directed by the Contract Manager.

The contract value was $110,000.

Similar open tenders12

Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Bridge Rehabilitation – Highway 49 over Spirit River at West Boundary of Rycroft (km 34.437)Infrastructure
17 Dec 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Culvert Replacement and Engineering Services for HWY 756 (Prentice Creek), HWY 761 (Blueberry Creek & Tributary to Wilson Creek), and HWY 22 (Cattlepass) – Alberta TransportationInfrastructure
19 Nov 2026
Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026
Riprap Improvements at Keho, Chain Lakes and Pine Coulee Reservoirs — AlbertaInfrastructure
25 Nov 2026
Construction and Maintenance of Gimli Harbour Ice Fishing Roads, Skating Trail and Open Skate AreaInfrastructure
03 Dec 2026
Engineering and Construction Administration — Athabasca Ranch PLUZ Trails, Access and Campground Upgrades near Hinton, ABInfrastructure
09 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Canal Liner Replacement – Lethbridge Northern Headworks Main Canal (Sta. 60+000–63+675)Water & Sanitation
26 Nov 2026

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.