Range Road 255 Rehabilitation: Chip Seal, Culvert Replacement, and Cement Stabilization
County of Wetaskiwin No. 10 · Awarded contract
AwardedRange Road 255 Rehabilitation: Chip Seal, Culvert Replacement, and Cement Stabilization
Awarded 10 Apr 2026
Awarded10 Apr 2026
Value$2,740,099.00
SupplierCentral City Asphalt Ltd.
ProvinceAlberta
CategoryInfrastructure
Ended 2mo ago5mo term
Awarded 10 Apr 2026Expired 15 Sept 2026
About
The County of Wetaskiwin No.
10 awarded a contract to Central City Asphalt Ltd.
for the rehabilitation of Range Road 255 from Township 470 to Highway 616, covering 8.300 kilometers.
The work includes chip seal, culvert replacement, cement stabilization, and other associated tasks.
The contract value is CAD 2,740,099.
Similar open tenders12
TenderCloses
Bridge Culvert Replacement and Related Works – Range Road 153 over SMRID Canal (Bridge File 84383), West of Purple Springs, ABInfrastructure
26 Nov 2026
Chip Seal, Crack Repair and Pavement Marking – Peace Region 2027 Seal Coat ProgramInfrastructure
02 Dec 2026
Full Depth Reclamation and Asphalt Pavement – Hwy 24 to 12 km S of Hwy 901 (km 0.000–16.700)Infrastructure
03 Dec 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Road Rehabilitation Design and Engineering Services — Lethbridge County (3 Road Segments)Infrastructure
24 Nov 2026
Minor Grading, Cold Milling and Asphalt Paving on Highway 576:02 (Km 16.080–29.120) — 2 km East of Hwy 849 to Hwy 851Infrastructure
01 Dec 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
Construction of 3.2 km Clay-Capped Municipal Road on Township Road 202 – RM of Miry Creek No. 229Infrastructure
07 Dec 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Hwy 2 & Hwy 12 Minor Grading, Cold Milling and Asphalt Concrete Pavement Works — Central AlbertaInfrastructure
08 Dec 2026
M.D. of Provost Gravel Road Rehabilitation – 10 Miles (2027 Construction Season)Infrastructure
24 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





