Alberta Transportation and Economic Corridors awarded a contract to Greenfield Construction Ltd.

for the removal and disposal of the existing bridge structure and construction of a structural steel girder bridge and other work at BF01916, where Highway 897 crosses the Vermilion River, 16 km north of Marwayne (km 7.423 to 8.500) in the Central Region.

The contract, valued at CAD 11,828,846.16, includes approximate quantities of 450 cubic metres of Heavy Rock Riprap (Class 1), 44 piles, 436 metres of pile driving, 49,337 kg of reinforcing steel placement, 110 tonnes of asphalt concrete pavement, 32,600 tonnes of aggregate supply, 16,700 tonnes of granular fill, 9,600 tonnes of granular base course, 81,700 cubic metres of common excavation, and 36,600 square metres each of borrow reclamation and topsoil replacement.

The contractor is to supply all materials, with a contract completion date of July 31, 2028.

Similar open tenders12

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.