Replacement of Precast Concrete Girder Bridge with Steel H-Pile and Prestressed Girder Spans in Bonnyville
Awarded 10 Jul 2025
About
The Municipal District of Bonnyville No.
87 awarded a contract to Lafarge Canada Inc - Edmonton Precast for the removal and disposal of an existing three-span precast concrete girder bridge on timber piles and the supply, setup, and driving of galvanized and plain steel H piles at abutments and piers.
The work includes SPCS abutments backwalls and wingwalls, new steel H-pile abutment and pier caps with stiffener plates, Class 1 heavy rock riprap, fabrication, delivery, and erection of three spans (8m-14m-8m) long type SL-510 prestressed girders, backfill at bridge ends, supply and installation of new TL-2 low height thrie beam bridgerail and approach rail transition, approach road guardrail, roadway work, and supply and installation of silt fence.
The contract value is CAD 1,685,871.
Similar open tenders12
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.