Lafarge Canada Inc - Edmonton Precast
Supplier · Infrastructure
Lafarge Canada Inc - Edmonton Precast
Won in the last 12 months$30M3 contractsValue won per quarter, last three years
Contracts on record3$30M in total
Running now0Latest win Nov 2026
Next contract endingMay 2027$2.6M · City of St. Albert
Biggest buyerCity of St. Albert94% of their value
What they win
How much they win each year, the size of a typical contract, and every contract on record.
Contract history
Replacement of Precast Concrete Girder Bridge with Steel H-Pile and Prestressed Girder Spans in BonnyvilleInfrastructure$1.7M10/07/2025Hebert Road Improvement Project Phase 2 Awarded to Lafarge Canada Inc - Edmonton PrecastInfrastructure$2.6M30/05/2025Ray Gibbon Drive Improvements Phase 3 and Optional Phase 4 Construction Awarded to Lafarge Canada Inc - Edmonton PrecastInfrastructure$25.6M01/05/2025
Who they win it from
Their biggest government buyers and how much of their work each one is.
Most of their work comes from one buyer: City of St. Albert, 94% of value.
Coming up
Contracts that end soon and may go back out to tender.
Contracts ending in the next three years1 contract · $2.6M
The next one ends May 2027 at City of St. Albert.
Recompete radar
1 expiring in 12moContracts nearing the end of their term. Some may go back out to tender when they expire.
About them
Company details, where they work and the names they trade under.
Also traded asLafarge Canada Inc - Edmonton Precast
Open tenders that match their work
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Closes 19 NovInfrastructureMajor Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Closes 24 NovInfrastructureBridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionCloses 16 DecInfrastructureHighway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Closes 25 NovInfrastructureBridge Rehabilitation – Highway 13 over CPKC, WetaskiwinCloses 25 NovInfrastructureEngineering Consultant Services for Asphalt Concrete Pavement on Highways 43 and 49 in AlbertaCloses 24 NovInfrastructureEngineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaCloses 11 DecInfrastructureDesign and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeCloses 26 NovInfrastructureConstruction Administration & Site Inspection for Highway No. 3 Bridge Replacement over Sturgeon River (west of Prince Albert)Closes 23 NovInfrastructureConstruction of Three-Span Precast Concrete and Steel Bridge (27 m x 8.53 m) – Big River, SKCloses 20 NovInfrastructureFull Depth Reclamation and Asphalt Pavement – Hwy 24 to 12 km S of Hwy 901 (km 0.000–16.700)Closes 3 DecInfrastructureBridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPCloses 7 DecInfrastructure
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





