Shoulder Pull and Upgrades on 9.28 km of Road Segments in County of Wetaskiwin No. 10
County of Wetaskiwin No. 10 · Awarded contract
AwardedShoulder Pull and Upgrades on 9.28 km of Road Segments in County of Wetaskiwin No. 10
Awarded 15 Jul 2024
Awarded15 Jul 2024
Value$726,897.00
ProvinceAlberta
CategoryInfrastructure
Ended 2y 2mo ago3mo term
Awarded 15 July 2024Expired 30 Sept 2024
About
County of Wetaskiwin No.
10 awarded a contract to Road to Rail Construction Group Inc.
for shoulder pull and upgrades to three road segments totaling 9.28 km.
The scope included mobilization, ditch excavation, waste excavation, cement stabilized subgrade, hand-laid riprap, shoulder pull, shaping and compacting, surface gravelling, and other work as indicated in the Unit Price Schedule and Special Provisions.
The contract value was CAD 726,897.
Similar open tenders12
TenderCloses
M.D. of Provost Gravel Road Rehabilitation – 10 Miles (2027 Construction Season)Infrastructure
24 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
Design and Tender Package for Grading and Surfacing of Highway No. 106 (Tyrrell Lake Access Rd to Hwy 167) — Saskatchewan Ministry of HighwaysInfrastructure
26 Nov 2026
Road Rehabilitation Design and Engineering Services — Lethbridge County (3 Road Segments)Infrastructure
24 Nov 2026
Full Depth Reclamation and Asphalt Pavement – Hwy 24 to 12 km S of Hwy 901 (km 0.000–16.700)Infrastructure
03 Dec 2026
Construction of 3.2 km Clay-Capped Municipal Road on Township Road 202 – RM of Miry Creek No. 229Infrastructure
07 Dec 2026
Grade Widening & Intersection Improvements – Stoney Trail at 52 Street SE (Eastbound Exit Lane & Dual Northbound-to-Westbound Right Turn)Infrastructure
14 Dec 2026
Supply and Install 750 mm Smooth Wall Steel Pipe Culvert by Boring on Highway 41 near Wakaw (40 m)Infrastructure
23 Nov 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Supply and Install 1,050 mm Smooth-Wall Steel Pipe Culvert by Boring on Highway 2 (12.78 km N of Hwy 312, near Wakaw) — 21 mInfrastructure
20 Nov 2026
Bridge Culvert Replacement and Related Works – Range Road 153 over SMRID Canal (Bridge File 84383), West of Purple Springs, ABInfrastructure
26 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





