Site Repairs at Frank Slide Interpretive Centre: Paver Replacement, Steel Boardwalk, and Exterior Improvements
Alberta Infrastructure · Awarded contract
AwardedSite Repairs at Frank Slide Interpretive Centre: Paver Replacement, Steel Boardwalk, and Exterior Improvements
Awarded 24 Jun 2026
Expires in 12mo1y 4mo term, 30% elapsed
Awarded 24 June 2026Expires 31 Oct 2027
About
Alberta Infrastructure awarded a contract to Everest Construction Management Ltd.
for various site repairs at the Frank Slide Interpretive Centre, including removal of interlocking pavers and replacement with a concrete slab-on-grade, replacement of the existing boardwalk superstructure with a new steel boardwalk structure, and miscellaneous exterior improvements such as guards, handrails, retaining walls, and repairs to the existing concrete retaining wall.
The contract value is CAD 3,031,000, with anticipated construction completion by October 31, 2027.
Similar open tenders12
TenderCloses
Site Restoration at 256 Smith Street – Fencing, Pavers, Planting and Sod RemediationConstruction
26 Nov 2026
Sulphur Mountain Boardwalk Repairs – Banff National Park (Stage Two Solicitation)Infrastructure
19 Nov 2026
Sanitary Sewer Repair and New Drain Pipe Installation – Northern Forestry Centre, EdmontonWater & Sanitation
19 Nov 2026
Stage 1 Watermain Upgrades – Fortress of Louisbourg National Historic SiteWater & Sanitation
19 Nov 2026
Structural Engineering Assessment and Design for Peace Regional Pool Mezzanine, Slide and Roof Joists – Town of Peace RiverConsultancy & Legal
20 Nov 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
M.D. of Provost Gravel Road Rehabilitation – 10 Miles (2027 Construction Season)Infrastructure
24 Nov 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Full Depth Reclamation and Asphalt Pavement – Hwy 24 to 12 km S of Hwy 901 (km 0.000–16.700)Infrastructure
03 Dec 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
Parking Lot and Paved Areas Recapitalization – Asphalt Replacement, Drainage Upgrades and Regrading (Complete by March 31, 2027)Construction
27 Nov 2026
Northwest Breakwater Wharf Reconstruction – St. Bride’s, NL (DFO)Infrastructure
27 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





