Tender: Supply and Install Smooth-Wall Steel Pipe Culverts by Boring on Highways 5 and 20 – 111 m Total
Released 15 days ago
About
Ministry of SaskBuilds and Procurement is seeking a supplier for the supply and installation of four smooth-wall steel pipe culverts installed by the boring method at one location on Highway No. 5 and three locations on Highway No. 20, with a total length of 111 m: one 900 mm diameter × 29 m, one 900 mm diameter × 22 m, one 1,350 mm diameter × 42 m, and one 750 mm diameter × 18 m. Completion is staged with Phase I due March 31, 2027 and Phase II due July 15, 2027. Bidders must include a deposit of 5% of the total bid, submit enquiries at least 3 business days before bid close to the Ministry of SaskBuilds and Procurement, and may request a debriefing within 30 days after award notification.
Tender breakdown
From 19 documentsBids will be rejected if Bidder has not obtained Saskatchewan COR or Letter of Equivalency prior to bid close
EPP requirements (notification, photos, on-site EPP copy) and potential WSA stop-work orders; contractor must submit EPP notification before starting work
DFO Letter of Advice applies at C.S. 20-07 km 7.10; construction in streambed prohibited April 16–June 30; Fish Collection Permit required before dewatering that site
Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.
Documents19
Grouped by what each file is for
Similar open tenders6
Similar awarded contracts12
Likely value $300K to $2.8MAgency spend history
Saskatchewan HighwaysContract size
What Saskatchewan Highways has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





