Tender: Supply and Installation of Smooth-Wall Steel Pipe Culverts by Boring – Highways 16, 52 and 310
Released 10 days ago
About
Ministry of SaskBuilds and Procurement is seeking a supplier for the supply and installation of ten smooth-wall steel pipe culverts using the boring method at nine highway locations (seven on Highway No. 16, one on Highway No. 52 and one on Highway No. 310). The works comprise one 1500 mm, two 1200 mm, two 1050 mm and five 750 mm diameter culverts for a total installed length of 275 m, together with the decommissioning of 13 culverts; completion is phased with Phase I by March 31, 2027 and Phase II by July 15, 2027. Bidders should note a 5% deposit with each tender, must submit inquiries at least 3 business days before close of bidding, and may request a debrief within 30 days after award.
Tender breakdown
From 19 documentsLiquidated damages: $1,000/day (Phase I and II) plus $10,000 lump sum — schedule risk can heavily penalize late Phase I completion
Site Occupancy charged $1,000 per Charged Day; charged days assessment suspended between Phase I and start of Phase II
AHPP locations (four km on C.S.16-15) have strict permit conditions (no earthen cofferdams, maintain downstream flow, pumps discharge requirements, grouting containment) — non-compliance can void permit or stop work
Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.
Documents19
Grouped by what each file is for
Similar open tenders6
Similar awarded contracts12
Likely value $850K to $6.0MAgency spend history
Saskatchewan HighwaysContract size
What Saskatchewan Highways has spent, year by year and by contract size, and who won the work.