Clearwater County · Awarded contract
Awarded

Asphalt Concrete Pavement and Road Improvements on Wall Street Road (Range Road 4-3) by Clearwater County

Awarded 01 Jun 2025

View live tenders
Awarded01 Jun 2025
Value$3,864,378.00
ProvinceAlberta
CategoryInfrastructure
Ended 1y 1mo ago5mo term
Awarded 1 June 2025Expired 15 Oct 2025

Clearwater County awarded a contract to Aecon Transportation West Ltd.

for asphalt concrete pavement (EPS), approach improvement, sideslope improvement, and other work on Wall Street Road (Range Road 4-3) from the County Boundary to the Junction of Highway 11, covering 21.025 km.

The contract includes approximately 30,400 t of Asphalt Concrete Pavement (EPS) Mix Type M1 (PG 52-34), 3,000 t of Granular Fill (Des.

2 Cl.

25), 6.9 km of sideslope improvement, 53 approach improvements, and 430 m of culvert supply and installation (600mm dia).

The contract value is CAD 3,864,378, with a completion date of October 15, 2025.

Similar open tenders12

Full Depth Reclamation and Asphalt Pavement – Hwy 24 to 12 km S of Hwy 901 (km 0.000–16.700)Infrastructure
03 Dec 2026
Asphalt Concrete Pavement and Roadworks – Hwy 661 to Hwy 663 & Hwy 663 to Hwy 2, North Central RegionInfrastructure
15 Dec 2026
Engineering Consultant Services for Asphalt Concrete Pavement on Highways 43 and 49 in AlbertaInfrastructure
01 Dec 2026
Hwy 2 & Hwy 12 Minor Grading, Cold Milling and Asphalt Concrete Pavement Works — Central AlbertaInfrastructure
08 Dec 2026
Minor Grading, Cold Milling and Asphalt Paving on Highway 576:02 (Km 16.080–29.120) — 2 km East of Hwy 849 to Hwy 851Infrastructure
01 Dec 2026
Chip Seal, Crack Repair and Pavement Marking – Peace Region 2027 Seal Coat ProgramInfrastructure
02 Dec 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Bridge Culvert Replacement and Related Works – Range Road 153 over SMRID Canal (Bridge File 84383), West of Purple Springs, ABInfrastructure
26 Nov 2026
Grade Widening & Intersection Improvements – Stoney Trail at 52 Street SE (Eastbound Exit Lane & Dual Northbound-to-Westbound Right Turn)Infrastructure
14 Dec 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Supply and Install 750 mm Smooth Wall Steel Pipe Culvert by Boring on Highway 41 near Wakaw (40 m)Infrastructure
23 Nov 2026
Supply and Install 1,050 mm Smooth-Wall Steel Pipe Culvert by Boring on Highway 2 (12.78 km N of Hwy 312, near Wakaw) — 21 mInfrastructure
20 Nov 2026

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.