Bridge Bearing and Deck Joint Replacement on Highway 893 over Vermilion River
Alberta Transportation and Economic Corridors · Awarded contract
AwardedBridge Bearing and Deck Joint Replacement on Highway 893 over Vermilion River
Awarded 14 Mar 2025
Awarded14 Mar 2025
Value$1,422,917.00
SupplierAccess BridgeWorks Inc.
ProvinceAlberta
CategoryInfrastructure
Ended 1y 1mo ago7mo term
Awarded 14 Mar 2025Expired 15 Oct 2025
About
Alberta Transportation and Economic Corridors awarded a contract to Access BridgeWorks Inc.
for bridge bearing replacement, deck joint replacement, and bridge rehabilitation on Highway 893 over the Vermilion River, north of Islay, including supply, fabrication, delivery, and installation of bearings and deck joint assemblies, refurbishment of abutment bearings, partial depth repair, removal of deck drains, concrete sealing and finishing, and drain troughs.
The contract value is $1,422,917, with a completion date of October 15, 2025.
Similar open tenders12
TenderCloses
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Bridge Rehabilitation – Highway 49 over Spirit River at West Boundary of Rycroft (km 34.437)Infrastructure
17 Dec 2026
Bridge Rehabilitation – Highway 36 over Red Deer River near Duchess, ABInfrastructure
26 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
Dunvegan Bridge Rehabilitation (BF73949) – Highway 2:68 over the Peace RiverInfrastructure
27 Nov 2026
Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Bridge Engineering Services Agreement – County of Vermilion River (2027–2029, option to extend)Infrastructure
30 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





