Bridge Rehabilitation on Highway 884:04 and 886:02 over Red Deer River
Alberta Transportation and Economic Corridors · Awarded contract
AwardedBridge Rehabilitation on Highway 884:04 and 886:02 over Red Deer River
Awarded 10 Jul 2024
Awarded10 Jul 2024
Value$1,367,627.00
SupplierVolker Stevin Highways Ltd.
ProvinceAlberta
CategoryInfrastructure
Ended 2y 4mo ago
Awarded 10 July 2024Expired 10 July 2024
About
Alberta Transportation and Economic Corridors awarded a contract to Volker Stevin Highways Ltd.
for bridge rehabilitation and other work on BF 09179 (Highway 884:04 over Red Deer River) and BF 13170 (Highway 886:02 over Red Deer River) in the Central Region.
The scope included lump sum approach rail repairs, bridgerail repairs, patch timber strip deck, heat straightening steel members, replacing steel members, and 60 metres of concrete crack repairs, with the contractor supplying all materials.
Valued at CAD 1,367,627, the contract had a completion date of October 15, 2025.
Similar open tenders12
TenderCloses
Bridge Rehabilitation – Highway 36 over Red Deer River near Duchess, ABInfrastructure
26 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Bridge Rehabilitation – Highway 49 over Spirit River at West Boundary of Rycroft (km 34.437)Infrastructure
17 Dec 2026
Dunvegan Bridge Rehabilitation (BF73949) – Highway 2:68 over the Peace RiverInfrastructure
27 Nov 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Repair and Rehabilitation of Central Pier, Lewes River Bridge (km 1393) – Alaska Highway #1, WhitehorseInfrastructure
17 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





