Bridgerail Rehabilitation and Other Work at Peace River Bridges
Alberta Transportation and Economic Corridors · Awarded contract
AwardedBridgerail Rehabilitation and Other Work at Peace River Bridges
Awarded 13 Feb 2026
Expires in 10mo1y 7mo term, 48% elapsed
Awarded 13 Feb 2026Expires 15 Sept 2027
About
Alberta Transportation and Economic Corridors awarded a contract to ARDY Rigging Ltd.
for bridgerail rehabilitation and other work on B.F.
75946 E.1 (existing arch bridge over Peace River) and B.F.
76060E (Highway 2 Eastbound over CN Railway) in Peace River, valued at CAD 35,069,754.57.
The scope includes traffic accommodation, environmental management, arch span access, arch tie corrosion repairs, supply and erection of 90 arch span hangers, span 6 repainting, deck waterproofing, heavy rock riprap, erosion control, and hydro seeding, with a contract completion date of September 15, 2027.
Similar open tenders12
TenderCloses
Dunvegan Bridge Rehabilitation (BF73949) – Highway 2:68 over the Peace RiverInfrastructure
27 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Bridge Rehabilitation – Highway 36 over Red Deer River near Duchess, ABInfrastructure
18 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





