Construction of Precast Prestressed Concrete Girder Bridges on Highway 690 near Deadwood
Alberta Transportation and Economic Corridors · Awarded contract
AwardedConstruction of Precast Prestressed Concrete Girder Bridges on Highway 690 near Deadwood
Awarded 04 Apr 2025
Awarded04 Apr 2025
Value$2,949,410.00
SupplierFormula Alberta Ltd.
ProvinceAlberta
CategoryInfrastructure
Ended 1y 1mo ago6mo term
Awarded 4 Apr 2025Expired 15 Oct 2025
About
Alberta Transportation and Economic Corridors awarded a contract to Formula Alberta Ltd.
for the construction of precast prestressed concrete girder bridges at BF72485 Watercourse Bridge and BF72488 Rousseau Creek Bridge on Highway 690 near Deadwood, including removal and disposal of existing bridge structures and other work.
The contract, valued at CAD 2,949,410, covers demolition and disposal, pile set-up (driven H-piles), roadway work, asphalt concrete pavement, abutment construction, and heavy rock riprap, with a completion date of October 15, 2025.
Similar open tenders12
TenderCloses
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Dunvegan Bridge Rehabilitation (BF73949) – Highway 2:68 over the Peace RiverInfrastructure
27 Nov 2026
Bridge Rehabilitation – Highway 49 over Spirit River at West Boundary of Rycroft (km 34.437)Infrastructure
17 Dec 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Bridge Rehabilitation – Highway 36 over Red Deer River near Duchess, ABInfrastructure
26 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Construction of Three-Span Precast Concrete and Steel Bridge (27 m x 8.53 m) – Big River, SKInfrastructure
20 Nov 2026
Culvert Replacement and Engineering Services for HWY 756 (Prentice Creek), HWY 761 (Blueberry Creek & Tributary to Wilson Creek), and HWY 22 (Cattlepass) – Alberta TransportationInfrastructure
19 Nov 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





