Electrical and Controls Extras for Springbank Off-Stream Reservoir

Awarded 04 Mar 2026

View live tenders
Awarded04 Mar 2026
Value$887,833.47
ProvinceAlberta
CategoryInfrastructure
Ended 28d ago8mo term
Awarded 4 Mar 2026Expired 22 Oct 2026

Alberta Transportation and Economic Corridors awarded a contract to North Star Contracting Inc.

for electrical and controls extras on the Springbank Off-Stream Reservoir (SR1), located 5 km west of Calgary, Alberta.

The work includes a lump sum for existing and temporary roads, an allowance for unforeseen work on permanent service lines and connections, care of water, demolition of the Highway 22 bridge pedestal, construction of a Highway 22 bridge communication building, and electrical power, controls, communications, and instrumentation for the Highway 22 bridge communication building, diversion channel control building, and office building, as well as earthworks and electrical power, controls, communications, and instrumentation for backbone fibre optic cable.

The contractor is to supply all materials.

Substantial performance is required by September 24, 2026, and total performance by October 22, 2026.

The contract value is CAD 887,833.47.

Similar open tenders12

Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Construction Administration & Site Inspection for Highway No. 3 Bridge Replacement over Sturgeon River (west of Prince Albert)Infrastructure
23 Nov 2026
Bridge Culvert Replacement and Related Works – Range Road 153 over SMRID Canal (Bridge File 84383), West of Purple Springs, ABInfrastructure
26 Nov 2026
Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026
SaskPower North–South Transmission Interconnection — Two ~250 km Lines and 230 kV Switching Station, SaskatchewanEnergy & Environment
14 Dec 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Construction Administration for Highway No. 8 Bridge Replacements over Bighorn Brook and Spruce Creek – Saskatchewan Ministry of HighwaysInfrastructure
30 Nov 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Distribution and Transmission Study to Address Forecasted Load Deficiency in South‑West Edmonton (Chappelle)Energy & Environment
03 Dec 2026

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.