Engineering and Construction Administration for Lost Creek Bridge Re-Installation in Castle Provincial Park
Alberta Forestry and Parks · Awarded contract
AwardedEngineering and Construction Administration for Lost Creek Bridge Re-Installation in Castle Provincial Park
Awarded 24 Jul 2025
Awarded24 Jul 2025
Value$116,295.00
ProvinceAlberta
CategoryInfrastructure
Expires in 2mo1y 6mo term, 87% elapsed
Awarded 24 July 2025Expires 29 Jan 2027
About
Alberta Forestry and Parks awarded a contract to ISL Engineering and Land Services Ltd.
for engineering and construction administration consultant services for the re-installation of the Lost Creek Bridge at Castle Provincial Park.
The scope included field assessment, evaluation of crossing locations, geotechnical investigations, hydrological and hydraulic modelling, preliminary and detailed bridge design, regulatory submissions, construction-ready drawings and tender documents, and construction phase support.
The contract value was $116,295.
Similar open tenders12
TenderCloses
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Construction Administration for Highway No. 8 Bridge Replacements over Bighorn Brook and Spruce Creek – Saskatchewan Ministry of HighwaysInfrastructure
30 Nov 2026
Construction Administration & Site Inspection for Highway No. 3 Bridge Replacement over Sturgeon River (west of Prince Albert)Infrastructure
23 Nov 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Bridge Rehabilitation – Highway 49 over Spirit River at West Boundary of Rycroft (km 34.437)Infrastructure
17 Dec 2026
Culvert Replacement and Engineering Services for HWY 756 (Prentice Creek), HWY 761 (Blueberry Creek & Tributary to Wilson Creek), and HWY 22 (Cattlepass) – Alberta TransportationInfrastructure
19 Nov 2026
Dunvegan Bridge Rehabilitation (BF73949) – Highway 2:68 over the Peace RiverInfrastructure
27 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





