Highway 201 Crack Repair, Cold Milling, and Asphalt Concrete Pavement Rehabilitation
Awarded 03 Mar 2025
About
Alberta Transportation and Economic Corridors awarded a contract to Aecon Transportation West Ltd.
for crack repair, cold milling, asphalt concrete pavement (ACP), and other work on Highway 201:08 from South of Nose Hill Drive to West of Sarcee Trail, covering kilometre 1.530 to 9.040 (SBL) and kilometre 1.597 to 8.305 (NBL) in the Southern Region.
The work includes approximately 128,800 tonnes of aggregate supply, 80,000 metres of spray patch crack repair, 35,150 square metres of 40 mm cold milling, 262,300 square metres of 60 mm cold milling, 127,100 tonnes of Superpave ACP (Mix Type 100-F-12.5, PG 64-28), bridge tie-ins, pavement messages, roadway line painting, high tension cable barrier supply and installation, solar rectangular rapid flashing beacon pedestrian crossings, and flexible guide posts.
The contract value is CAD 15,592,823.2, with a completion date of October 15, 2025.
Similar open tenders12
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.