Highway 28:02 and 37:04 Intersection Improvements by E Construction

Awarded 17 May 2024

View live tenders
Awarded17 May 2024
Value$2,433,233.06
ProvinceAlberta
CategoryInfrastructure
Ended 2y 6mo ago21d term
Awarded 17 May 2024Expired 7 June 2024

Alberta Transportation and Economic Corridors awarded a contract to E Construction, A Division of Colas Western Canada Inc.

for intersection improvements at Highway 28:02 and 37:04, including selective grading, granular base course, cold milling, asphalt concrete pavement, highway line painting, street light installation, and traffic signal installation.

The work spans kilometre 8.211 to 8.688 (NBL, SBL) and 9.010 to 9.420 (EBL, WBL) in the North Central Region, with approximate quantities comprising 10,730 tonnes of aggregate, 7,620 cubic metres of excavation, 3,630 cubic metres of borrow excavation, 6,840 tonnes of granular base course, 100 square metres of cold milling, 210 tonnes of asphalt mix Type S3, 1,840 tonnes of Type H2 (PG 58-28), 1,850 tonnes of Type H2 (PG 64-28), 90 metres of trenching and backfilling, 845 metres of trenched underground electrical conduit, 255 metres of pushed conduit, 1,130 metres of secondary cable, 10 street light standards, and 1 distribution enclosure.

The contract value is CAD 2,433,233.06, with a completion date of October 30, 2024.

Similar open tenders12

Full Depth Reclamation and Asphalt Pavement – Hwy 24 to 12 km S of Hwy 901 (km 0.000–16.700)Infrastructure
03 Dec 2026
Hwy 2 & Hwy 12 Minor Grading, Cold Milling and Asphalt Concrete Pavement Works — Central AlbertaInfrastructure
08 Dec 2026
Minor Grading, Cold Milling and Asphalt Paving on Highway 576:02 (Km 16.080–29.120) — 2 km East of Hwy 849 to Hwy 851Infrastructure
01 Dec 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Engineering Consultant Services for Asphalt Concrete Pavement on Highways 43 and 49 in AlbertaInfrastructure
24 Nov 2026
Grade Widening & Intersection Improvements – Stoney Trail at 52 Street SE (Eastbound Exit Lane & Dual Northbound-to-Westbound Right Turn)Infrastructure
14 Dec 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Balzac Interchange Upgrade – Highway 566/Highway 2 Design‑Bid‑Build Construction (Balzac, Alberta)Infrastructure
15 Dec 2026

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.