Parking Lot Paving and Pedestrian Walkway Resurfacing at Grande Prairie Northern Addictions Centre
Alberta Infrastructure · Awarded contract
AwardedParking Lot Paving and Pedestrian Walkway Resurfacing at Grande Prairie Northern Addictions Centre
Awarded 15 Oct 2026
Awarded from this tender, closed 29 Sept 2026Parking Lot Paving and Pedestrian Walkway Resurfacing – Grande Prairie Northern Addictions Centre
View the tender →Expires in 1y 10mo1y 11mo term, 5% elapsed
Awarded 15 Oct 2026Expires 1 Sept 2028
About
Alberta Infrastructure awarded a contract to Beairsto & Associates Engineering Ltd.
for parking lot paving and resurfacing of the pedestrian walkway at the Grande Prairie Northern Addictions Centre, valued at CAD 121,737.5.
The contract followed a request for proposals process that included two clarifications and an addendum.
Similar open tenders12
TenderCloses
Parking Lot and Paved Areas Recapitalization – Asphalt Replacement, Drainage Upgrades and Regrading (Complete by March 31, 2027)Construction
27 Nov 2026
Full Depth Reclamation and Asphalt Pavement – Hwy 24 to 12 km S of Hwy 901 (km 0.000–16.700)Infrastructure
03 Dec 2026
Paving and Roadway Resurfacing Works on Boulevard BrassardInfrastructure
30 Nov 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Engineering Consultant Services for Asphalt Concrete Pavement on Highways 43 and 49 in AlbertaInfrastructure
01 Dec 2026
Renewal of Grand Boulevard Infrastructure — Paving and Civil Engineering WorksInfrastructure
11 Jan 2027
Sanitary Sewer Repair and New Drain Pipe Installation – Northern Forestry Centre, EdmontonWater & Sanitation
19 Nov 2026
Jasper Cemetery Expansion Phase 1 – Main Road Reconstruction & Parking RedevelopmentConstruction
10 Dec 2026
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Prequalification of Prime Contractors for Alley Renewal Construction – City of EdmontonInfrastructure
06 Feb 2030
Minor Grading, Cold Milling and Asphalt Paving on Highway 576:02 (Km 16.080–29.120) — 2 km East of Hwy 849 to Hwy 851Infrastructure
01 Dec 2026
Police Headquarters HVAC Upgrades — City of Grande Prairie (10202-99th Street)Construction
08 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





