Rehabilitation of Beverly Bridge on Yellowhead Trail Eastbound
City of Edmonton · Awarded contract
AwardedRehabilitation of Beverly Bridge on Yellowhead Trail Eastbound
Awarded 25 Feb 2025
Awarded25 Feb 2025
Value$11,179,471.00
SupplierCWP Constructors Ltd.
AgencyCity of Edmonton
ProvinceAlberta
CategoryInfrastructure
Ended 19d ago1y 8mo term
Awarded 25 Feb 2025Expired 31 Oct 2026
About
The City of Edmonton awarded a contract to CWP Constructors Ltd.
for the rehabilitation of the Beverly Bridge, located on Yellowhead Trail Eastbound over the North Saskatchewan River between Victoria Trail NW and 17 Street NW.
The work included the supply of all labour, materials, equipment, and services required to complete the rehabilitation.
The contract value was CAD 11,179,471.
Similar open tenders12
TenderCloses
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Bridge Rehabilitation – Highway 49 over Spirit River at West Boundary of Rycroft (km 34.437)Infrastructure
17 Dec 2026
Bridge Rehabilitation – Highway 36 over Red Deer River near Duchess, ABInfrastructure
26 Nov 2026
Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026
Repair and Rehabilitation of Central Pier, Lewes River Bridge (km 1393) – Alaska Highway #1, WhitehorseInfrastructure
17 Dec 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Dunvegan Bridge Rehabilitation (BF73949) – Highway 2:68 over the Peace RiverInfrastructure
27 Nov 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





