Rehabilitation of Bridge File 76818 on Range Road 393A over Bighorn River
Clearwater County · Awarded contract
AwardedRehabilitation of Bridge File 76818 on Range Road 393A over Bighorn River
Awarded 08 Aug 2025
Awarded08 Aug 2025
Value$482,790.00
SupplierBridgemen Services Ltd.
AgencyClearwater County
ProvinceAlberta
CategoryInfrastructure
Ended 7mo ago9mo term
Awarded 8 Aug 2025Expired 30 Apr 2026
About
Clearwater County awarded a contract to Bridgemen Services Ltd.
for substructure rehabilitation and limited superstructure rehabilitation on the existing steel truss bridge (Bridge File 76818) carrying Range Road 393A over the Bighorn River.
The scope included mobilization, traffic accommodation for bridge construction, stripdeck replacement, partial subdeck replacement, wheelguard replacement, bridgerail replacement, approach rail repairs, sister stringers, truss repairs, replacement of caps and corbels, resetting bearings, treating and banding piles, and miscellaneous repairs.
The contract value was CAD 482,790.
Similar open tenders12
TenderCloses
Bridge Culvert Replacement and Related Works – Range Road 153 over SMRID Canal (Bridge File 84383), West of Purple Springs, ABInfrastructure
26 Nov 2026
Construction Administration for Highway No. 8 Bridge Replacements over Bighorn Brook and Spruce Creek – Saskatchewan Ministry of HighwaysInfrastructure
30 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Replacement of Bridge File 06547 on Range Road 15 over Strawberry Creek – Leduc CountyInfrastructure
03 Dec 2026
Bridge Rehabilitation – Highway 49 over Spirit River at West Boundary of Rycroft (km 34.437)Infrastructure
17 Dec 2026
Bridge Rehabilitation – Highway 36 over Red Deer River near Duchess, ABInfrastructure
26 Nov 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Dunvegan Bridge Rehabilitation (BF73949) – Highway 2:68 over the Peace RiverInfrastructure
27 Nov 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
Culvert Demolition, Replacement and Roadway Restoration – Bridge Files 00474, 06800, 85257Infrastructure
02 Dec 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





