Replacement of Bridge File 01459 in Flagstaff County
Flagstaff County · Awarded contract
AwardedReplacement of Bridge File 01459 in Flagstaff County
Awarded 12 Feb 2025
Awarded12 Feb 2025
Value$747,660.00
SupplierFormula Alberta Ltd.
AgencyFlagstaff County
ProvinceAlberta
CategoryInfrastructure
Ended 1y 6mo ago3mo term
Awarded 12 Feb 2025Expired 15 May 2025
About
Flagstaff County awarded a contract to Formula Alberta Ltd.
for the removal of an existing 8.5m HC girder bridge on a timber treated substructure and its replacement with a new 6.0m SL-510 girder bridge on a steel substructure, located 25 km south of Sedgewick on Range Road 120.
The contract value is CAD 747,660.
Similar open tenders12
TenderCloses
Replacement of Bridge File 06547 on Range Road 15 over Strawberry Creek – Leduc CountyInfrastructure
03 Dec 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Bridge Culvert Replacement and Related Works – Range Road 153 over SMRID Canal (Bridge File 84383), West of Purple Springs, ABInfrastructure
26 Nov 2026
Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026
Highway 35 Bridge Replacement over Barrier River — Site Inspection & Construction AdministrationInfrastructure
18 Nov 2026
Replacement of Bridge Structure BF9808 – Beaver CountyInfrastructure
03 Dec 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Construction Administration for Highway No. 8 Bridge Replacements over Bighorn Brook and Spruce Creek – Saskatchewan Ministry of HighwaysInfrastructure
30 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





