Bridge Culvert Installation on Highway 43 over Harold Creek by CTR Contracting

Awarded 15 Jan 2026

View live tenders
Awarded15 Jan 2026
Value$3,291,277.00
ProvinceAlberta
CategoryInfrastructure
Ended 19d ago10mo term
Awarded 15 Jan 2026Expired 31 Oct 2026

Alberta Transportation and Economic Corridors awarded a contract to CTR Contracting Ltd for bridge culvert installation and other work on Highway 43 over Harold Creek, southeast of Beaverlodge in the Peace Region.

The scope included 2,085 cubic metres of channel excavation, supply and installation of welded steel pipe (1,829 mm and 1,678 mm OD), pipe extensions and liner, and backfill with granular and non-granular materials.

The contract value was $3,291,277, with a completion date of October 31, 2026.

Similar open tenders12

Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Culvert Replacement and Engineering Services for HWY 756 (Prentice Creek), HWY 761 (Blueberry Creek & Tributary to Wilson Creek), and HWY 22 (Cattlepass) – Alberta TransportationInfrastructure
19 Nov 2026
Bridge Culvert Replacement and Related Works – Range Road 153 over SMRID Canal (Bridge File 84383), West of Purple Springs, ABInfrastructure
26 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
Supply and Install 750 mm Smooth Wall Steel Pipe Culvert by Boring on Highway 41 near Wakaw (40 m)Infrastructure
23 Nov 2026
Supply and Install 1,050 mm Smooth-Wall Steel Pipe Culvert by Boring on Highway 2 (12.78 km N of Hwy 312, near Wakaw) — 21 mInfrastructure
20 Nov 2026

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.