Bridge Culvert Replacement and Erosion Control on Highway 63 near Fort McMurray
Awarded 26 Jun 2025
About
Alberta Transportation and Economic Corridors awarded a contract to In-Line Contracting for bridge culvert replacement and other work on Highway 63:10 over Halfway Creek and Highway 63:11 over Prairie Creek, approximately 15 km and 9 km south of Fort McMurray, respectively.
The work includes erosion control, erosion repair, supply and installation of 80.47 metres of S.W.S.P.
(3353 mm diameter x 15.9 mm thickness), 175 cubic metres of grouting of abandoned culverts, 250 cubic metres of Class 1 heavy rock riprap, 2,500 square metres of Type C erosion control soil covering, and 150 cubic metres of Class 2 heavy rock riprap, with the contractor supplying all materials.
The contract value is $3,895,635, and the completion date is March 31, 2026.
Similar open tenders12
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





