Construction of Concrete Floor Slab at Reynolds Museum Storage Building
Alberta Arts, Culture and Status of Women · Awarded contract
AwardedConstruction of Concrete Floor Slab at Reynolds Museum Storage Building
Awarded 29 May 2026
Awarded29 May 2026
Value$140,448.00
SupplierSande Brothers Concrete Ltd
ProvinceAlberta
CategoryConstruction
Ended 4mo ago2mo term
Awarded 29 May 2026Expired 31 July 2026
About
Alberta Arts, Culture and Status of Women awarded a contract to Sande Brothers Concrete Ltd for the engineering and construction of a 60 x 180 ft concrete floor slab and an 18 x 20 ft driveway approach pad at the Reynolds Museum storage building.
The scope included subgrade preparation, placement of a compacted crushed stone subbase, installation of a poly barrier, and pouring a 6-inch thick concrete slab with fiber reinforcement and #4 rebar.
The work also covered power trowel and broom finishes, control cuts, and provision of an engineering report.
The contract value was CAD 140,448.
Similar open tenders12
TenderCloses
Reynolds Museum Resource Centre File Compacting Shelving System — Design, Supply and InstallationArts & Culture
30 Nov 2026
Full Depth Reclamation and Asphalt Pavement – Hwy 24 to 12 km S of Hwy 901 (km 0.000–16.700)Infrastructure
03 Dec 2026
Construction of Approx. 800 m² Modular Contained-Use Building, 75 m² Garage and Site Development – Dillon, SaskatchewanConstruction
09 Dec 2026
Sanitary Sewer Repair and New Drain Pipe Installation – Northern Forestry Centre, EdmontonWater & Sanitation
19 Nov 2026
Edmonton Remand Centre Resilient Flooring Replacement — Edmonton, AlbertaConstruction
26 Nov 2026
Localized Repair of Garage Floor Concrete SlabConstruction
24 Nov 2026
Interior Renovation of SaskEnergy Saskatoon Service Centre (565 m² / 6,080 sq ft)Construction
26 Nov 2026
Supply and Installation of Industrial Pallet Racking, 1,296 sq ft Mezzanine and 75 ft × 16 ft Security Partition — Upper Canada Village, MorrisburgManufacturing & Industrial
24 Nov 2026
M.D. of Provost Gravel Road Rehabilitation – 10 Miles (2027 Construction Season)Infrastructure
24 Nov 2026
Construction of Simkin Centre Family Addition — 1,703m² Concrete, Steel and Masonry FrameConstruction
01 Dec 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Renovation of Medical Device Reprocessing Department – Drumheller Health Centre (Phase 1 Demo, Site Works & Building Envelope)Construction
27 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far