Culvert and Bridge Replacement Engineering Services for Alberta Transportation
Alberta Transportation and Economic Corridors · Awarded contract
AwardedCulvert and Bridge Replacement Engineering Services for Alberta Transportation
Awarded 01 Dec 2025
Expires in 3y4y term, 24% elapsed
Awarded 1 Dec 2025Expires 30 Nov 2029
About
Alberta Transportation and Economic Corridors awarded a contract to WSP Canada Inc.
for preliminary engineering, detailed design, contract tendering, construction supervision/contract administration, post-construction and warranty inspection for culvert replacements at BF 74930 (Highway 42:08 over 2nd Order Tributary to Ghostpine Creek) and BF 07206 (Highway 585:02 Cattle Pass), and standard bridge replacements at BF 79251 (Highway 601:04 over Redwillow Creek), BF 09677 (Highway 852:02 over Bigknife Creek), and BF 80849 (Highway 852:02 over Bigknife Creek).
The contract value is CAD 1,578,509.
Similar open tenders12
TenderCloses
Culvert Replacement and Engineering Services for HWY 756 (Prentice Creek), HWY 761 (Blueberry Creek & Tributary to Wilson Creek), and HWY 22 (Cattlepass) – Alberta TransportationInfrastructure
19 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Construction Administration for Highway No. 8 Bridge Replacements over Bighorn Brook and Spruce Creek – Saskatchewan Ministry of HighwaysInfrastructure
30 Nov 2026
Construction Administration & Site Inspection for Highway No. 3 Bridge Replacement over Sturgeon River (west of Prince Albert)Infrastructure
23 Nov 2026
Bridge Culvert Replacement and Related Works – Range Road 153 over SMRID Canal (Bridge File 84383), West of Purple Springs, ABInfrastructure
26 Nov 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far