Engineering Consultant Services for Bridge BF 77872-2 on Highway 63 Over Poplar Creek
Alberta Transportation and Economic Corridors · Awarded contract
AwardedEngineering Consultant Services for Bridge BF 77872-2 on Highway 63 Over Poplar Creek
Awarded 29 Nov 2024
Awarded29 Nov 2024
Value$432,032.00
SupplierGeoMetrix Group Engineering Ltd.
ProvinceAlberta
CategoryInfrastructure
Ended 1y 12mo ago1d term
Awarded 29 Nov 2024Expired 30 Nov 2024
About
Alberta Transportation and Economic Corridors awarded a contract to GeoMetrix Group Engineering Ltd.
for engineering consultant services for Bridge BF 77872-2 carrying Highway 63:12 over Poplar Creek, 19 km north of Fort McMurray, Alberta.
The scope includes preliminary engineering, detailed design, contract tendering, contract administration, construction and fabrication supervision, post-construction and warranty inspection for bridge engineering and other work.
The contract value is CAD 432,032.
Similar open tenders12
TenderCloses
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Culvert Replacement and Engineering Services for HWY 756 (Prentice Creek), HWY 761 (Blueberry Creek & Tributary to Wilson Creek), and HWY 22 (Cattlepass) – Alberta TransportationInfrastructure
19 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Construction Administration for Highway No. 8 Bridge Replacements over Bighorn Brook and Spruce Creek – Saskatchewan Ministry of HighwaysInfrastructure
30 Nov 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Dunvegan Bridge Rehabilitation (BF73949) – Highway 2:68 over the Peace RiverInfrastructure
27 Nov 2026
Bridge Rehabilitation – Highway 49 over Spirit River at West Boundary of Rycroft (km 34.437)Infrastructure
17 Dec 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Construction Administration & Site Inspection for Highway No. 3 Bridge Replacement over Sturgeon River (west of Prince Albert)Infrastructure
23 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





