Engineering Consultant Services for Highway 28:02 Twinning (Contracts A & B)

Awarded 20 Jul 2026

View live tenders
Awarded20 Jul 2026
Value$9,474,067.90
ProvinceAlberta
CategoryInfrastructure
Expires in 8y 1mo8y 5mo term, 4% elapsed
Awarded 20 July 2026Expires 15 Dec 2034

Alberta Transportation and Economic Corridors awarded a contract to WSP Canada Inc.

for engineering consultant services on Highway 28:02 twinning, covering preliminary engineering, detailed design, contract tendering, construction supervision, contract administration, post-construction activities (legal survey, final details submission), and warranty inspection for roadway and bridges, including a limited planning study.

The contract value is CAD 9,474,067.9.

Similar open tenders12

Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Engineering Consultant Services for Asphalt Concrete Pavement on Highways 43 and 49 in AlbertaInfrastructure
24 Nov 2026
Engineering Consultant Services for CMR Program Projects – North Central Region (Assignments 1–3) – Alberta Transportation and Economic CorridorsInfrastructure
07 Dec 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Culvert Replacement and Engineering Services for HWY 756 (Prentice Creek), HWY 761 (Blueberry Creek & Tributary to Wilson Creek), and HWY 22 (Cattlepass) – Alberta TransportationInfrastructure
19 Nov 2026
Grade Widening & Intersection Improvements – Stoney Trail at 52 Street SE (Eastbound Exit Lane & Dual Northbound-to-Westbound Right Turn)Infrastructure
14 Dec 2026
City of Wetaskiwin – Engineering Consulting Services for Water, Roads and Utilities (3‑Year Standing Offer with 2‑Year Option, 2027–2029)Infrastructure
10 Dec 2026
Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.