Preliminary Engineering and Construction Supervision for Highway 858:02 Upgrades
Alberta Transportation and Economic Corridors · Awarded contract
AwardedPreliminary Engineering and Construction Supervision for Highway 858:02 Upgrades
Awarded 26 Sep 2024
Ended 2y 2mo ago4d term
Awarded 26 Sept 2024Expired 30 Sept 2024
About
Alberta Transportation and Economic Corridors awarded a contract to WSP Canada Inc.
for preliminary engineering, detailed design, contract tendering, contract administration, construction supervision, post-construction and warranty inspection for grading, granular base course, asphalt concrete pavement and other work on Highway 858:02, located 22 km north of Highway 55 and 18 km south of Highway 881.
The contract value is CAD 2,933,516.2.
Similar open tenders12
TenderCloses
Engineering Consultant Services for Asphalt Concrete Pavement on Highways 43 and 49 in AlbertaInfrastructure
24 Nov 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Construction Administration for Grading and Gravel Surfacing — Highway 915-01 (35.44 km from Highway 102)Infrastructure
15 Dec 2026
Engineering Consultant Services for CMR Program Projects – North Central Region (Assignments 1–3) – Alberta Transportation and Economic CorridorsInfrastructure
07 Dec 2026
Culvert Replacement and Engineering Services for HWY 756 (Prentice Creek), HWY 761 (Blueberry Creek & Tributary to Wilson Creek), and HWY 22 (Cattlepass) – Alberta TransportationInfrastructure
19 Nov 2026
Grade Widening & Intersection Improvements – Stoney Trail at 52 Street SE (Eastbound Exit Lane & Dual Northbound-to-Westbound Right Turn)Infrastructure
14 Dec 2026
Full Depth Reclamation and Asphalt Pavement – Hwy 24 to 12 km S of Hwy 901 (km 0.000–16.700)Infrastructure
03 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far