Regional Bridge Engineering Consultant for As-and-When Required New Bridge Maintenance and Rehabilitation Services in Hanna and Vermilion Districts
Alberta Transportation and Economic Corridors · Awarded contract
AwardedRegional Bridge Engineering Consultant for As-and-When Required New Bridge Maintenance and Rehabilitation Services in Hanna and Vermilion Districts
Awarded 28 Jun 2025
Awarded28 Jun 2025
Value$3,000,000.00
SupplierLEX3 Engineering Inc.
ProvinceAlberta
CategoryInfrastructure
Expires in 2y 4mo3y 9mo term, 37% elapsed
Awarded 28 June 2025Expires 31 Mar 2029
About
Alberta Transportation and Economic Corridors awarded a contract to LEX3 Engineering Inc.
for regional bridge engineering consultant services on an as-and-when required basis for new bridge maintenance and rehabilitation in the Hanna and Vermilion Districts, Contract Maintenance Areas 512, 517, 518, and 519, Central Region.
The contract value is CAD 3,000,000.
Similar open tenders12
TenderCloses
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Engineering Consultant Services for CMR Program Projects – North Central Region (Assignments 1–3) – Alberta Transportation and Economic CorridorsInfrastructure
07 Dec 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Bridge Engineering Services Agreement – County of Vermilion River (2027–2029, option to extend)Infrastructure
30 Nov 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Road Rehabilitation Design and Engineering Services — Lethbridge County (3 Road Segments)Infrastructure
24 Nov 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Culvert Replacement and Engineering Services for HWY 756 (Prentice Creek), HWY 761 (Blueberry Creek & Tributary to Wilson Creek), and HWY 22 (Cattlepass) – Alberta TransportationInfrastructure
19 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





