Replacement of Mill Creek Trestle Bridge and 76 Avenue Culvert in Edmonton
Awarded 27 Oct 2025
About
The City of Edmonton awarded a contract to Alberco Construction Ltd.
for the construction of the Mill Creek Trestle Bridge and Culvert Replacement, valued at CAD 16,420,817.23.
The work included mobilization, road closures, traffic accommodation, site management, water management, environmental protection, excavation, removal of existing structures, cast-in-place piling, riprap installation, abutments, girder erection, backfill, approach slab concrete pours, bridge rail and guardrail installation, timber trestle bridge with concrete foundations, roadway removals, subgrade and base grading, asphalt concrete paving, naturalization, topsoil and seeding, site cleanup, and warranty and maintenance.