River Crossing Horizontal Directional Drilling Works for Electrical Infrastructure
City of Lethbridge · Awarded contract
AwardedRiver Crossing Horizontal Directional Drilling Works for Electrical Infrastructure
Awarded 01 Aug 2026
Awarded01 Aug 2026
Value$4,705,033.26
SupplierWhissell Contracting Ltd.
AgencyCity of Lethbridge
ProvinceAlberta
CategoryInfrastructure
Ended 19d ago3mo term
Awarded 1 Aug 2026Expired 31 Oct 2026
About
The City of Lethbridge awarded a contract to Whissell Contracting Ltd.
for River Crossing Horizontal Directional Drilling (HDD) works for electrical infrastructure, valued at CAD 4,705,033.26.
Similar open tenders12
TenderCloses
Citywide Horizontal Directional Drilling Services — City of Medicine Hat (As-Needed Contract)Infrastructure
01 Dec 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Supply and Install 750 mm Smooth Wall Steel Pipe Culvert by Boring on Highway 41 near Wakaw (40 m)Infrastructure
23 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Supply and Install 1,050 mm Smooth-Wall Steel Pipe Culvert by Boring on Highway 2 (12.78 km N of Hwy 312, near Wakaw) — 21 mInfrastructure
20 Nov 2026
Canal Liner Replacement – Lethbridge Northern Headworks Main Canal (Sta. 60+000–63+675)Water & Sanitation
26 Nov 2026
Watermain and Storm Drainage Upgrades with CPKC Rail Crossings — 15 St SE/19 Av SE and 26 Av SE (Dartmouth Rd/Highfield Rd SE)Water & Sanitation
01 Dec 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Supply and Install Smooth-Wall Steel Pipe Culverts by Boring on Highways 5 and 20 – 111 m TotalInfrastructure
19 Nov 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





