Supply and Installation of Bridge Culvert over Tributary to Shunda Creek near Nordegg
Awarded 28 May 2024
About
Clearwater County awarded a contract to Volker Stevin Highways Ltd.
for the supply and installation of a new bridge culvert over a Tributary to Shunda Creek, approximately 5 km northwest of Nordegg (SW 32-40-15-5).
The work included installing a 2.4 m diameter CSP culvert with a 52 m invert length, traffic accommodation by staged construction, site isolation, turbidity monitoring, fish capture and release, demolition and disposal of bridge structures, excavation with geotextile filter fabric, supply and assembly of culvert materials, supply and installation of rocky substrate with substrate holders, backfill with material testing, heavy rock riprap erosion protection, roadway work, guardrail with delineator guide posts, and permanent environmental protection devices including seeding and plantings.
The contract value was CAD 934,000.
Similar open tenders12
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





