Bridge Rehabilitation on Highway 11 over Thompson Creek by SVEMY Construction

Awarded 30 Jan 2025

View live tenders
Awarded30 Jan 2025
Value$1,096,191.49
ProvinceAlberta
CategoryInfrastructure
Ended 1y 10mo ago1d term
Awarded 30 Jan 2025Expired 31 Jan 2025

Alberta Transportation and Economic Corridors awarded a contract to SVEMY Construction Ltd.

for bridge rehabilitation and other work on BF76089-2 carrying Highway 11 over Thompson Creek, 82 km southwest of Nordegg, at a value of CAD 1,096,191.49.

The scope includes traffic accommodation, precast concrete units, high-performance concrete, asphalt concrete pavement, guardrail installation, and backfill, with a contract completion date of October 1, 2025.

Similar open tenders12

Bridge Rehabilitation – Highway 49 over Spirit River at West Boundary of Rycroft (km 34.437)Infrastructure
17 Dec 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Construction Administration for Highway No. 8 Bridge Replacements over Bighorn Brook and Spruce Creek – Saskatchewan Ministry of HighwaysInfrastructure
30 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Dunvegan Bridge Rehabilitation (BF73949) – Highway 2:68 over the Peace RiverInfrastructure
27 Nov 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Construction Administration & Site Inspection for Highway No. 3 Bridge Replacement over Sturgeon River (west of Prince Albert)Infrastructure
23 Nov 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026

Other similar contracts12

Construction of Precast Prestressed Concrete Girder Bridge and Demolition of Existing Bridge on Highway 11:04InfrastructureSVEMY Construction Ltd.
$4,527,350.8
Bridge Replacement on Highway 734 over Elk Creek near Ricinus, ABInfrastructureSVEMY Construction Ltd.
$1,349,000
Construction of Cast-In-Place Concrete Girder Bridge (BF 73387) over Fisher Creek on Highway 762:02InfrastructureSVEMY Construction Ltd.
$2,705,000
Bridge Rehabilitation on Highway 1 and Highway 2 in Southern AlbertaInfrastructureCarmacks Enterprises Ltd.
$5,057,525
Bridge Rehabilitation on Highway 60:04 over Highway 16 near EdmontonInfrastructureERK Construction Inc.
$1,631,300
Bridge Rehabilitation on Highway 884:04 and 886:02 over Red Deer RiverInfrastructureVolker Stevin Highways Ltd.
$1,367,627
Highway 40 Rehabilitation and Bridge Construction in North Central AlbertaInfrastructureEnviro-Ex Contracting Ltd
$54,166,625.33
Bridge Rehabilitation and Demolition at B.F. 74661 on Highway 1 near ExshawInfrastructureEverest Construction Management Ltd.
$1,547,835
Bridge Rehabilitation on 16 Avenue North Over Deerfoot Trail Interchange in CalgaryInfrastructureEverest Construction Management Ltd.
$4,431,255
Highway 43 Rehabilitation and Safety Upgrades from Eagle Tower Road to Athabasca River BridgeInfrastructureKnelsen Sand & Gravel Ltd.
$18,078,790.55
Rehabilitation of Sheep River Bridge on Highway 2 near Aldersyde, AlbertaInfrastructureVolker Stevin Highways Ltd.
$1,587,000
Bridge Rehabilitation of Hwy. 2 over Blackmud Creek near NiskuInfrastructureERK Construction Inc.
$2,685,869

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.