Engineering Consultant Services for Bridge Replacement on Highway 547 over Bow River
Alberta Transportation and Economic Corridors · Awarded contract
AwardedEngineering Consultant Services for Bridge Replacement on Highway 547 over Bow River
Awarded 08 Dec 2025
Awarded08 Dec 2025
Value$3,665,932.00
ProvinceAlberta
CategoryInfrastructure
Expires in 9y 3mo10y 2mo term, 9% elapsed
Awarded 8 Dec 2025Expires 15 Feb 2036
About
Alberta Transportation and Economic Corridors awarded a contract to DIALOG Alberta Architecture Engineering Interior Design Planning Inc.
for engineering consultant services for the replacement of the bridge carrying Highway 547:04 over the Bow River (NE 9-21-23-W4M).
The scope includes preliminary engineering, detailed design, contract tendering, construction and fabrication supervision, contract administration, post-construction and warranty inspection.
The contract value is CAD 3,665,932.
Similar open tenders12
TenderCloses
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Highway 35 Bridge Replacement over Barrier River — Site Inspection & Construction AdministrationInfrastructure
18 Nov 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Construction Administration for Highway No. 8 Bridge Replacements over Bighorn Brook and Spruce Creek – Saskatchewan Ministry of HighwaysInfrastructure
30 Nov 2026
Culvert Replacement and Engineering Services for HWY 756 (Prentice Creek), HWY 761 (Blueberry Creek & Tributary to Wilson Creek), and HWY 22 (Cattlepass) – Alberta TransportationInfrastructure
19 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Construction Administration & Site Inspection for Highway No. 3 Bridge Replacement over Sturgeon River (west of Prince Albert)Infrastructure
23 Nov 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





