Engineering Services for Bridge and Culvert Replacements on Highways 50, 42, and 56
Alberta Transportation and Economic Corridors · Awarded contract
AwardedEngineering Services for Bridge and Culvert Replacements on Highways 50, 42, and 56
Awarded 13 Mar 2024
Ended 2y 7mo ago29d term
Awarded 13 Mar 2024Expired 11 Apr 2024
About
Alberta Transportation and Economic Corridors awarded a contract to WSP Canada Inc.
for preliminary engineering, detailed design, contract tendering, contract administration, construction and fabrication supervision, and post-construction services for bridge and culvert replacements, including BF01423 Bridge Replacement Carrying HWY 50 Over Parlby Creek, BF70184 Culvert Replacement Carrying HWY 42 Over Threehills Creek, and BF74508 Bridge Replacement Carrying HWY 56 Over Big Valley Creek.
The contract value is $744,459.00.
Similar open tenders12
TenderCloses
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Culvert Replacement and Engineering Services for HWY 756 (Prentice Creek), HWY 761 (Blueberry Creek & Tributary to Wilson Creek), and HWY 22 (Cattlepass) – Alberta TransportationInfrastructure
19 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Construction Administration for Highway No. 8 Bridge Replacements over Bighorn Brook and Spruce Creek – Saskatchewan Ministry of HighwaysInfrastructure
30 Nov 2026
Construction Administration & Site Inspection for Highway No. 3 Bridge Replacement over Sturgeon River (west of Prince Albert)Infrastructure
23 Nov 2026
Engineering Consultant Services for Asphalt Concrete Pavement on Highways 43 and 49 in AlbertaInfrastructure
24 Nov 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





