Bridge Culvert Installation and Other Work on Highway 875:04 over Twelve Mile Coulee (B.F. 72029)

Awarded 10 Jul 2025

View live tenders
Awarded10 Jul 2025
Value$1,249,258.00
ProvinceAlberta
CategoryInfrastructure
Ended 5mo ago11mo term
Awarded 10 July 2025Expired 15 June 2026

Alberta Transportation and Economic Corridors awarded a contract to Bullin Construction Co.

Ltd.

for bridge culvert installation and other work on Highway 875:04 over Twelve Mile Coulee (Bridge File 72029), including demolition and disposal of the existing bridge structure, supply and assembly of 62 metres of corrugated steel pipe with couplers, backfill with crushed aggregate and non-granular material, 200 cubic metres of heavy rock riprap (Class 1), roadway work, and traffic accommodation.

The contract value is $1,249,258, with a completion date of June 15, 2026.

Similar open tenders12

Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Supply and Install 1,050 mm Smooth-Wall Steel Pipe Culvert by Boring on Highway 2 (12.78 km N of Hwy 312, near Wakaw) — 21 mInfrastructure
20 Nov 2026
Supply and Install 750 mm Smooth Wall Steel Pipe Culvert by Boring on Highway 41 near Wakaw (40 m)Infrastructure
23 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Culvert Replacement and Engineering Services for HWY 756 (Prentice Creek), HWY 761 (Blueberry Creek & Tributary to Wilson Creek), and HWY 22 (Cattlepass) – Alberta TransportationInfrastructure
19 Nov 2026
Supply and Installation of Smooth-Wall Steel Pipe Culverts by Boring – Highways 16, 52 and 310Infrastructure
25 Nov 2026
Bridge Culvert Replacement and Related Works – Range Road 153 over SMRID Canal (Bridge File 84383), West of Purple Springs, ABInfrastructure
26 Nov 2026
Supply and Install Smooth-Wall Steel Pipe Culverts by Boring on Highways 5 and 20 – 111 m TotalInfrastructure
19 Nov 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.